What Is Falsework? Types, Design and UK Rules

Falsework is a temporary structure that supports a permanent structure, or its formwork, until the permanent structure can support itself. Props under a slab, support towers and the temporary supports under a bridge deck are all falsework. In the UK it is managed as temporary works under BS 5975, now BS 5975-1:2024 and BS 5975-2:2024.

What is falsework used for?

Falsework carries the weight of wet concrete, formwork, workers and plant while a structure is being built. Typical uses include supporting suspended slab soffits, beams, bridge decks and arches until the concrete or steel has gained enough strength to stand on its own.

Types of falsework systems

Type What it is Typical use
Props (shores) Standalone adjustable steel or aluminium props, often used with timber or aluminium beams Slab soffits and beams in buildings
Tower and frame systems Legs, frames and braces assembled into towers Higher slabs and larger loads
Heavy-duty steel systems Heavy steel shoring for large loads and heights Bridges, transfer slabs and civil works
Tube and fitting (“birdcage”) Scaffold tube and couplers built as a grid Irregular shapes where system kit does not fit

Most systems share the same parts: base plates or feet at the bottom, adjustable spindles to set the height, the vertical members, bracing for stability, and heads or beams at the top that carry the formwork. Ordering parts? Our falsework systems guide lists the accessories each system needs.

How is falsework designed in the UK?

BS 5975 is the UK code of practice for temporary works. Since February 2025 it is published in two parts: BS 5975-1:2024 (management procedures) and BS 5975-2:2024 (falsework design and implementation), succeeding BS 5975:2019. BS EN 12812:2008 sets performance requirements and general design rules for falsework.

  • Loads: the design must cover the weight of concrete and formwork, construction loads, and wind and other environmental loads.
  • Stability: loss of stability is a main cause of falsework collapse, so bracing and lateral restraint matter as much as leg capacity. BS 5975 recommends designing falsework for a horizontal force of at least 2.5% of the vertical load to allow for erection tolerances (Designing Buildings).
  • Foundations: the ground or slab under each leg must carry the load. Base plates and sole boards spread it.

Who is responsible for falsework on site?

BS 5975 sets out named roles for managing temporary works (Designing Buildings):

  • Designated Individual (DI): a senior person who runs the organisation’s temporary works procedures.
  • Temporary Works Coordinator (TWC): has overall responsibility for managing temporary works on a site.
  • Temporary Works Supervisor (TWS): handles day-to-day tasks, such as inspections, delegated by the TWC.
  • Temporary Works Designer (TWD): designs the falsework.
  • Design Checker: checks that the design meets the brief and is correct.

Falsework design check categories

Category Used for Who checks
CAT 0 Standard solutions only Another member of the site or design team
CAT 1 Simple designs Another member of the design team
CAT 2 More complex or involved designs Someone not involved in the design
CAT 3 Complex or innovative designs Another organisation

Source: Designing Buildings, summary of BS 5975.

Falsework accessories

Falsework relies on small parts as much as the main members: strut feet for a firm base, ratchet spindles for adjustment, beam clamps for fixing to steel, and bolts with nuts for connections. See the full formwork and falsework accessories range, or read formwork vs falsework.

Related guides: formwork striking times · slab edge formwork · types of formwork

Buying for a job? Shop falsework accessories and formwork accessories for UK sites, priced on a trade quote.

Buying for this job?

OM Private Ltd supplies Strut Feet, Slab Feet, Primary Beam Clamps, Corner Ratchets, and all falsework accessories to sites across the UK.

Request a trade quoteCall +44 7452 889827

Trade prices on any quantity · UK-wide delivery · Quote requests 24/7

Frequently asked questions

Is falsework the same as formwork?

No. Formwork shapes the concrete. Falsework supports the formwork, or the structure, until it can carry itself.

Is falsework temporary works?

Yes. Falsework is temporary works and in the UK is managed under BS 5975 (BS 5975-1:2024 and BS 5975-2:2024), with a temporary works coordinator responsible on site.

When can falsework be removed?

Only when the permanent structure can carry its own load, as set by the temporary works design and authorised under the site’s temporary works procedure.

What is the most common cause of falsework failure?

Loss of stability is a main cause of collapse, which is why bracing, lateral restraint and sound foundations are part of every falsework design.

Supplying a job? Browse formwork and falsework accessories or request a quote.

Sources: BSI, BS 5975-1:2024 and BS 5975-2:2024; BSI, BS EN 12812:2008; Designing Buildings, Falsework; Designing Buildings, Temporary Works Design.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top